A Female and Minority-owned Disadvantaged Small Business Enterprise
Certified
MBE, FBE, SBE, DBE
580 W Crossville Road
Roswell, GA 30075
(770) 569-7038
Contact

Category

Past Projects
BIG CYPRESS RESERVATION R2T assisted the Seminole Tribe of Florida (STOF) with the design and construction management of several projects on the Big Cypress Reservation Serving as the Owner’s representatives, we oversaw the construction of the new wastewater treatment plant and repairs to the Big Cypress Airport runway. We also assisted STOF with the construction...
Continue Reading
BIG CYPRESS WASTEWATER R2T provided owner representation for the Big Cypress Wastewater Treatment Plant, Big Cypress Reservation, Florida. The project included a Sequencing Batch Reactor (SBR) at the Big Cypress Reservation to meet future demands and current effluent discharge regulations. The facilities for this project consisted of: Extensive site modifications to meet geotechnical foundation requirements...
Continue Reading
BRIGHTON WATER TREATMENT Managing construction of the Brighton WTP R2T provided overall construction management and inspection services for the Brighton Water Treatment Plant, Brighton Reservation, Florida. The project consisted of the construction of a membrane softening water treatment plant at the Brighton Reservation to meet future demands and current drinking water regulations. The facilities for...
Continue Reading
NATIONAL PARKS SERVICE Creating an access road for the national parks service The National Park Service (NPS) owns and operates the Chattahoochee River National Recreation Area (CRNRA) located north of the City of Atlanta, Georgia on the banks of the Chattahoochee River. R2T assisted the NPS with the design and construction of the Hewlett Field...
Continue Reading
64TH AVENUE DEVELOPMENT Design & Construction for the 64th Avenue Development Hollywood Reservation, Florida The Seminole Tribe of Florida (STOF) constructed a housing development on 64th Avenue in the Hollywood Reservation. The comprehensive project required surveying of the proposed location, development of site and civil requirements, and storm-water permitting. Also needed were utility location and...
Continue Reading
FHWA AIR & NOISE MODELING Modeling the Impacts of Noise and Air Quality for Transportation Planning R2T performs air and noise modeling for various projects within the state of Georgia as part of the National Environmental Protection Act (NEPA). The air and noise modeling assist planners in determining the impacts of road and intersection construction and...
Continue Reading
DEKALB WATER REUSE As a part of the Brown and Caldwell Team, we are assisting DeKalb County with solving challenges related to water reuse. Our approach to assisting the County is to overcome challenges unique to inter-basin transfers between the Chattahoochee River Basin and the Ocmulgee River Basin within the Atlanta Metropolitan area. Our tasks...
Continue Reading
DEKALB RECLAMATION Solving water reclamation for Dekalb county As a part of the DeKalb Water Alliance Team, we are assisting DeKalb County with solving challenges related to the upgrade and expansion of the Snapfinger and Polebridge Creek Wastewater Reclamation Facilities and complying with the County’s NPDES MS4 requirements. Dekalb County is a diverse community of...
Continue Reading
KILLER CREEK Providing MS4 Oversight in the Killer Creek Watershed R2T provided professional assistance for general engineering consulting services for the Foe Killer Creek Watershed Improvement Plan as a part of City of Roswell’s Municipal Separate Storm Sewer System (MS4) permitted Total Maximum Daily Load (TMDL) program regulated by the Georgia Environmental Protection Division (EPD)....
Continue Reading
EAST PARK STORAGE Philadelphia Water Department Advanced Storage Facility R2T was contracted as a sub-consultant to work alongside CH2M Hill’s Water Business Group to provide design and engineering services for the Philadelphia Water Department’s East Park Reservoir, a state-of-the art 60 million gallon storage facility. R2T led process equipment and process yard piping design. The...
Continue Reading
1 2