A Female and Minority-owned Disadvantaged Small Business Enterprise
Certified
MBE, FBE, SBE, DBE
580 W Crossville Road
Roswell, GA 30075
(770) 569-7038
Contact

GDOT SR 135 at Altamaha River

ClientGeorgia Department of Transportation (GDOT)
LocationHazlehurst, GA
ServicesPermitting

GDOT SR 135 at Altamaha River

The replacement of the SR 153 bridge over the Altamaha River is taking place as proposed by the Georgia Department of Transportation (GDOT). The project consists of the construction of a replacement bridge for the existing structurally deficient bridge over the Altamaha River (Located at State Route (SR) 135/ US 221/ Uvalda Hwy) built in 1952.

The bridge consists of 41 spans of steel plate girders and rolled beams on H‐piles, and concrete columns under concrete caps. The design vehicle used for this bridge is below the current standards. The bridge and deck had concrete cracking, spalling/delamination, and observed efflorescence. R2T was responsible for:

  • Section 404 Regional Permit
  • Stream Buffer Variance
  • Ecology Re-Evaluation Support to GDOT
  • Notice of Intent for Construction