DeKalb Design Build – Package 3

Under an EPA Consent Decree, DeKalb County is required to develop and implement effective capacity, management, operations, and maintenance programs for its wastewater collection system, including a continuing sewer assessment and rehabilitation program. As the lead engineer of the Design-Build for Gravity Sewer System Rehabilitation, Replacement, and Construction – Package 3 (DB3) project, R2T provided aerial surveying, […]

Plantation Bay Wastewater Treatment Facility Upgrades

R2T was responsible for the installation of one influent screening system, submersible triplex master pump station, a 0.5 MGD package process plant, a filtration system, chlorine contact tank modifications, one submersible duplex reject pump station, a 1.0 MG reject water ground storage tank, a motor control center room, a standby generator and associated yard piping, […]

Noonday Water Reclamation Facility

The Noonday Water Reclamation project called for the replacement of six bulk storage tanks and elevated walkway, the addition of seven chemical metering pump skids, and an addition of 4,000 linear ft. of chemical feed piping. All new piping, coatings, electrical, instrumentation and controls were placed inside the chemical building. In addition, R2T was responsible […]

Tropical Farms and North Treatment Plant Improvements

The Tropical Farms and North Facilities are an existing Water Treatment Plant and Wastewater Treatment Plant in Martin County that have undergone expansion and rehabilitation. The project involved the replacement of the exiting chemical feed and storage systems and structures, the installment of effluent filters to replace undersized basins, and the WAS feed systems to […]

Brighton Water Treatment Plant

The Seminole Tribe of Florida (STOF) constructed a Nano filtration water treatment plant at the Hollywood Reservation to meet future demands and current effluent discharge regulations. STOF tasked R2T with providing overall project management and owner representation for the Hollywood Water Treatment Plant. The Hollywood Facilities consisted of extensive site coordination to address limited space […]

Philadelphia Water System Master Plan

The Philadelphia Water Department has embarked on a project to develop a sustainable water plan that includes a 25-year capital improvement plan. R2T staff provided onsite support to develop the plan in a manner that is sustainable for the Philadelphia Water System. R2T’s scope included the following. Condition Assessment: Developed industry-standard forms for documenting the […]