Construction and O&M

Plantation Bay Wastewater Treatment Facility Upgrades

R2T was responsible for the installation of one influent screening system, submersible triplex master pump station, a 0.5 MGD package process plant, a filtration system, chlorine contact tank modifications, one submersible duplex reject pump station, a 1.0 MG reject water ground storage tank, a motor control center room, a standby generator and associated yard piping, […]

Noonday Water Reclamation Facility

The Noonday Water Reclamation project called for the replacement of six bulk storage tanks and elevated walkway, the addition of seven chemical metering pump skids, and an addition of 4,000 linear ft. of chemical feed piping. All new piping, coatings, electrical, instrumentation and controls were placed inside the chemical building. In addition, R2T was responsible […]

Tropical Farms and North Treatment Plant Improvements

The Tropical Farms and North Facilities are an existing Water Treatment Plant and Wastewater Treatment Plant in Martin County that have undergone expansion and rehabilitation. The project involved the replacement of the exiting chemical feed and storage systems and structures, the installment of effluent filters to replace undersized basins, and the WAS feed systems to […]

Brighton Water Treatment Plant

The Seminole Tribe of Florida (STOF) constructed a Nano filtration water treatment plant at the Hollywood Reservation to meet future demands and current effluent discharge regulations. STOF tasked R2T with providing overall project management and owner representation for the Hollywood Water Treatment Plant. The Hollywood Facilities consisted of extensive site coordination to address limited space […]

City of Atlanta Water Supply Program

R2T was subcontracted as part of the City of Atlanta Water Supply Program design team to support infrastructure upgrades to convert the Bellwood Quarry into a raw water storage facility. The program entails a 10-foot diameter tunnel to convey water from the Chattahoochee River to the new reservoir with shafts and pump stations to deliver […]

Fulton-Cobb Diversion Line and Pump Station

R2T assisted the Fulton County Department of Public Works with the development of the design-build construction of the Fulton-Cobb Diversion Pipeline and Pump Station. A new pump station and pipeline which will be installed to connect the Riverside Road Pump Station to an existing line of the Cobb County Water System (CCWS) with available capacity […]

GDOT SR 135 at Altamaha River

The replacement of the SR 153 bridge over the Altamaha River is taking place as proposed by the Georgia Department of Transportation (GDOT). The project consists of the construction of a replacement bridge for the existing structurally deficient bridge over the Altamaha River (Located at State Route (SR) 135/ US 221/ Uvalda Hwy) built in […]